Bathroom Renovation Plumbing: Complete Step-by-Step Process

Planning a bathroom remodel? Understand every plumbing phase from demolition to final fixtures so your project stays on budget and on time.

4 min read

Project Overview

DetailTypical Range
Total duration2-6 weeks (plumbing portion)
Plumbing cost€2,000-€8,000
Full bathroom renovation€8,000-€25,000+
Permits requiredYes, for moving drain/supply lines
DIY feasibilityLow — licensed plumber required for most work

Phase 1: Planning and Design (Week 1-2)

Before any demolition begins, your plumber needs a finished layout. Moving a toilet 30 cm costs far less than moving it 2 metres because drain relocation requires breaking concrete or rerouting through joists.

  • Finalize fixture positions — toilet, shower/bath, vanity, bidet
  • Decide on fixture types (wall-hung toilet vs floor-mounted changes rough-in requirements)
  • Confirm hot water capacity supports the new layout
  • Get 2-3 plumber quotes with the same finalized plan
  • Check if building permits are needed in your municipality

Cost Factors That Increase Budget

ChangeAdded CostWhy
Moving toilet position€800-€2,500Drain relocation, floor work
Adding second sink€400-€900New supply and drain lines
Converting bath to walk-in shower€600-€1,500New drain, waterproofing
Underfloor heating (wet system)€1,200-€3,000New manifold and piping
Relocating water heater€500-€1,500Extended supply runs

Phase 2: Demolition and Rough-Out (Week 2-3)

Old fixtures come out first. Your plumber caps existing lines, then the demolition crew removes tile, drywall, and flooring to expose pipe runs.

  • Disconnect and remove all existing fixtures
  • Cap water supply and drain lines
  • Inspect existing pipes for corrosion, lead, or polybutylene
  • Document any hidden damage (rotted subfloor, mould behind walls)

Key decision point: If your home has galvanized steel or polybutylene pipes, this is the time to replace them. Patching old pipes into new work creates failure points.

Phase 3: Rough-In Plumbing (Week 3-4)

The most critical phase. Supply lines and drains are installed to exact positions before walls and floors close up.

  • Install new drain lines with proper slope (1-2% grade toward stack)
  • Run copper or PEX supply lines to each fixture position
  • Install shower valve body and mixing valve at correct height
  • Add shut-off valves for each fixture
  • Pressure test all supply lines (typically 6-8 bar for 30 minutes)
  • Schedule municipal inspection if required

Phase 4: Waterproofing and Tile (Week 4-5)

Between rough-in and finish plumbing, other trades handle waterproofing, tile, and wall finishing. Your plumber coordinates with them on:

  • Shower pan liner or tray installation
  • Waterproof membrane application around shower valve
  • Proper drain connection to shower tray
  • Wall blocking for grab bars or heavy fixtures

Phase 5: Finish Plumbing and Testing (Week 5-6)

Final fixtures go in after tile and paint are complete.

  • Install toilet, vanity, faucets, showerhead
  • Connect dishwasher or washing machine if in bathroom
  • Test every fixture for leaks under pressure
  • Check drain flow rates
  • Verify hot water reaches all fixtures at correct temperature
  • Final inspection sign-off

Checklist Before Your Plumber Starts

  • ☐ Bathroom layout finalized with exact fixture positions
  • ☐ All fixtures purchased or ordered (plumber needs spec sheets)
  • ☐ Permits obtained if required
  • ☐ Alternative bathroom arrangement for 2-6 weeks
  • ☐ Clear access path from entrance to bathroom
  • ☐ Water shutoff location identified and tested
  • ☐ Budget contingency of 15-20% set aside

FAQ

Can I keep the toilet in the same position to save money?

Yes. Keeping fixtures in their original positions avoids drain relocation, which is the most expensive change. You can upgrade every fixture and fitting while maintaining existing pipe positions for significant savings.

How long will I be without a bathroom?

Plan for 3-5 days minimum without any bathroom use during demolition and rough-in. If you have a second bathroom, the disruption is manageable. Otherwise, arrange alternatives.

Should I replace all the pipes while the walls are open?

If your home is over 40 years old with original plumbing, yes. The labor to access pipes later far exceeds the cost of replacing them now. PEX piping is affordable and has a 50+ year lifespan.